Increased availability for wind turbines
In the event of maintenance, downtime can be significantly reduced as worn or defective parts can be quickly replaced with Plug & Play functionality.
The installers and operators of wind turbines are under significant pressure to save time and costs. A wind turbine that is not ready for use produces no electricity and achieves no grid feed-in compensation.
Wind turbines are being designed with increasing modularity. This helps to increase the flexibility of their construction, while also accelerating the process of replacing components.
The individual units are only assembled into a complete wind turbine once they have reached the construction site, thus making the use of connectors a real advantage.
For example, drives for the rotor blade adjustment and wind tracking, as well as components such as slip ring assemblies or generator brakes, can be connected and installed simply and quickly. Thanks to the use of connectors, there is no longer a need for complex hand wiring work. In the event of maintenance, downtime can be significantly reduced as worn or defective parts can be quickly replaced with Plug & Play functionality.
Many types of wind turbines use a gearbox so that the speed and torque is matched between the rotor and the generator, thus optimising the facility’s efficiency. Connectors accelerate the installation: with pre-assembled cables and connectors such as
Connectors also offer advantages for tower lighting. The power bus components for the lighting can be pre-installed in the tower segments. On the construction site, the installation technicians – who are usually not electricians – only need to join the segments together.
Particularly robust for industrial applications
Resistance to corrosion and ozone: for outdoor use
Han-Eco® "click and mate" assembly concept
IP65
Hoods/housings for more demanding environmental requirements
Metal hoods and housings with excellent corrosion resistance
Locking lever made of high-quality stainless steel
IP67
For harsh outdoor environments
Excellent EMC characteristics
Metal hoods and housings with excellent corrosion resistance
Your benefits at a glance:
Shorter downtimes due to maintenance and service
Reduced wiring costs and faster commissioning in the field
Less personnel required for on-site construction
Reduced stock levels for spare parts due to standardisation
Changes are easier to make on-site when it comes to extensions, additional equipment, etc.
Connectivity in Wind Turbines
This PDF White paper will show you how connectors could increase the efficiency of wind turbines and reduce the CAPEX and OPEX (PDF | 5 MB | 22 pages)
HARTING Han®-Videos
Catalogues, Brochures, Flyer
White Paper Download
Learn how connectors can increase the efficiency of a wind turbine and reduce the CAPEX and OPEX costs.