Industrial Connectors High Power Connectors Circular Connectors M12 System Cabling har-modular®: PCB Connectors
News Room Press & media contacts Technology magazine tec.news
PEOPLE. POWER. PARTNERSHIP. Jobs Your Contact Persons

Industrial connectors / Han®


Overview
Rectangular connectors
Rectangular connectors
Industrial circular connectors
Industrial circular connectors
Connectors & cable assemblies for specific applications
Connectors & cable assemblies for specific applications

Circular connectors


Overview
Metric circular connectors
Metric circular connectors
Industrial circular connectors
Industrial circular connectors

Device connectivity


Overview
PCB connectors
PCB connectors
Panel feed throughs
Panel feed throughs
Cable connectors and cable assemblies
Cable connectors and cable assemblies

Industrial Ethernet Switches


Overview
Industrial Ethernet Switches
Industrial Ethernet Switches

Operator interfaces


Overview
Operator interfaces
Operator interfaces

Charging equipment for Electromobility


Overview
Charging equipment for Electromobility
Charging equipment for Electromobility

Tools


Overview
Tools
Tools

Cable assemblies & bulk cables


Overview
Power and signal
Power and signal
Data
Data
Bulk cables
Bulk cables

Industries


Railway
Railway Overview
Automation
Automation - Hero Image
Energy
HARTING connectors inside a wind turbine
Machinery
Machinery
E-Mobility Technologies
AES sector graphic MOBILITY
Data Centres
Data Centers Website Touchpoint Graphic - 1200 x 628.jpg
Semiconductor Tool Connectivity
SemiconductorManufacturing_Overview.tif
Agriculture Technologies
Industry - Agriculture Technologies Overview
Hydrogen Technologies
Hydrogen Ecosystem Overview

Solutions


Customised Solutions
HARTING customised solution
Circular connectors cable assemblies
Cable assemblies circular connectors
Industrial Ethernet solutions
Industrial Ethernet solutions
Field wireable connectors
Field installation
Single Pair Ethernet
Cable Connectors Cable Assemblies Data connectors Single Pair Ethernet
D-Sub PushPull
D-Sub PushPull connect
Solenoid systems
Solenoid systems
MID Solutions
MID Solutions

The Technology Group


About HARTING Technology Group
HQT Building, Espelkamp
The future needs the past
The Future needs the Past
The Harting family
A family-run Company
An Outstanding Company
We are proud about our awards
Facts & figures
Facts and Figures

HARTING in Finland


HARTING in Finland
HARTING in Finland - Technopolis Holding Plc
Contact HARTING Finland
Handshake

Sustainability


Our Responsibility
Our Responsibility
Our Corporate Culture
Our Corporate Culture
Our Environment
Our environment
Our Technologies
Our technologies
Our Social Commitment
Our Social Commitment
Environmental Statement
Road with painted yellow arrow line
Whistleblower System
Protect by Seeing and Acting - BKMS Whistleblower System
Sustainability Certificates
CSR Certificates
Human Rights
Declarations

Quality


Integrated Management System
2024-05_GettyImages-1214111373_man woman talk tablet.jpg
Our quality claim
HQT Building, Espelkamp
Testing and Laboratories
Material analysis
Our Social Commitment
Our Social Commitment
Our Environment
Our environment
Download Certificates - Integrated Management System
CSR Certificates

Support & Services


Engineering Data & Services
Engineering Data & Services
Configurators
Configurator Image person in front of Desktop with Han configuration
Website Training Center
Website Training Center
More about Digital Twin
Digital Twin Image
myHARTING
Website Advanced Stage
Newsletter subscription
newlsetter confirmation

Downloads


Download Documents
Downloads
Download Manager (Download Product Data)
Download Product Data
Download Certificates - Integrated Management System
CSR Certificates
Download Declarations - Product Compliance
CSR Certificates

Buy Products


Direct order via myHARTING
Direct order via myHARTING
Find Distributors
Customer Support - Front of HARTING plant 1 HQT
Digital Procurement (EDI, OCI, WebService)
Digital Procurement (EDI, OCI, WebService)

Partner Management


Supplier Portal
Supplier Portal
General supplier information
Handshake

Contact


Contact HARTING Finland
Handshake
HARTING Worldwide
HARTING Worldwide - Flags

Alternatives:

Search by series
Configurators
  1. Home
  2. News
  3. Building Smarter Data Center Infrastructure for the AI Age
Products
23 October 2025
8 minutes

Building Smarter Data Center Infrastructure for the AI Age


Serving next-generation, AI-driven applications requires a dramatic rethink of traditional data center design. Data center infrastructure must evolve rapidly – becoming not only larger, but smarter, faster, and greener. Every connection system and square foot now counts in the race to keep up with exponential demand.
Data Centre header background

This article originally featured in Data Centre & Network News.

Artificial intelligence (AI) has moved from hype to headline, impacting everything from health diagnostics to financial analysis. While the public marvels at AI breakthroughs, the engines powering these advances — the world’s data centers — face growing, behind-the-scenes challenges. As organizations expand their AI capabilities, the energy needed to support modern computing infrastructure is rising at an unprecedented rate.

Current research projects that global data center power demand will increase by 50% as soon as 2027 and 165% by 2030, with much of this surge attributed to AI workloads’ explosive growth. Already, data centers account for approximately 2% of worldwide electricity consumption and forecasts suggest this share will continue its upward march. The resulting strain extends beyond server rooms; it is currently reshaping energy supply chains, policy priorities, and environmental strategy across industries.

Rising to the infrastructure challenge

Serving next-generation, AI-driven applications requires a dramatic rethink of traditional data center design. Historically, a data center's infrastructure balanced a mix of physical and virtual resources — servers, storage, networking, power distribution units, cooling systems, security protocols, and supporting elements like racks and fire suppression — all engineered for reliability and uptime.

AI’s energy-hungry, compute-intensive tasks have shattered these historical balances. Data Centers today must deliver far more power to denser racks, operate reliably under heavier loads, and deploy new capacity at speeds unimaginable even a decade ago. These requirements are putting immense pressure on every inch of physical infrastructure, from the electrical grid connection to the server cabinet.

Navigating power and cooling demands

One of the most acute challenges is arising from escalating power and cooling needs. Where historical rack architecture required 16 or 32A, current designs push 70, 100, or even 200A, often in the same amount of physical rack space. These giant increases not only generate more heat, but require thicker, less flexible power cabling, raising new problems for deployment and ongoing maintenance.

Efficiently removing heat from ever-denser configurations is a major engineering feat. Next-generation cooling technologies — ranging from liquid cooling to full-system immersion — are becoming essential rather than optional. At the same time, every connection point and cable run becomes a potential source of inefficiency or risk. Operators can no longer afford energy loss, heat generation, or even the downtime that results from outdated power distribution or poorly optimized layouts.

The space and scalability constraint

AI workloads are increasingly mission-critical. Even short interruptions in data center uptime can lead to significant financial loss or damaging outages for users and services. With power loads climbing fast and every square foot optimized, the need for trustworthy, quickly serviceable infrastructure grows more urgent. Reliable system operation is now a defining competitive factor for data center operators.

To complicate matters further, capacity needs are accelerating, but available space remains finite. In many regions, the cost and scarcity of real estate forces data centers to pack as much compute and power as possible into smaller footprints. As higher-power architectures proliferate, the infrastructure supporting them — from power to networking — must become more compact and adaptable, maintaining robust operation without sacrificing maintainability or safety.

Because new workloads can spike unpredictably, data center leaders now require infrastructure that can be rapidly scaled up, upgraded, or reconfigured, sometimes within days rather than months. The traditional model of labor-intensive rewiring is proving unsustainable in today’s emerging reality.

Sustainability in the spotlight

Environmental scrutiny from regulators, investors, and end-users places data centers at the heart of the global decarbonization agenda. Facilities must now integrate renewable energy, maximize electrical efficiency, and minimize overall carbon footprints while delivering more power each year. But achieving these goals demands holistic change from energy procurement and grid strategy down to every connector, cable, and cooling loop inside the facility.

The challenges of the AI era are being met with new ideas at every level of the data center: smarter Data Centers Building Management Systems now orchestrate lighting, thermal control, and energy use with unprecedented efficiency; cooling technologies are evolving quickly, as operators push beyond the limits of traditional air-based systems; advanced power distribution and grid connectivity solutions are enabling better load balancing, more reliable energy supply, and easier renewable integration.

Within this broad transformation, the move towards modular, plug-and-play connections — sometimes called connectorization — is having a dramatic impact. Unlike hardwired installations — which are slow to deploy, often hard to scale and maintain, and require specialized labor that is often unavailable – connectorized infrastructure supports pre-assembled, pre-tested units that can be installed in days rather than weeks and by the workforce that is already available on-site. This not only gets new capacity online faster, but also reduces the opportunity for error, simplifies expansions, and supports higher power throughput within constrained spaces.

Connectors designed for current and future demands minimize heat and energy loss, enhance reliability, and simplify upgrades. Maintenance is easier and faster, with less need for specialized expertise and less operational downtime. These modular technologies are also helping data centers better optimize their architecture, manage complex workloads, and future-proof their operations.

Cooperation and adaptation in a complex landscape

Modernizing data center infrastructure is not simply a technical challenge, but one that requires broad collaboration between technology vendors, utilities, cloud providers, regulators, and policymakers. Federal incentives, innovative funding, and public-private partnerships are all working in support of grid modernization efforts, while the need for flexibility in design and operation allows data centers to adapt to regional differences in energy supply, regulation, and demand.

While AI has redefined what is possible, it has also redefined what is required behind the scenes. Data center infrastructure must evolve rapidly — becoming not only larger, but smarter, faster, and greener. Every connection system and square foot now counts in the race to keep up with exponential demand.

will-stewart.jpg

William Stewart

Position: Senior Industry Segment Manager for Data Centers

  • Company: HARTING

Will brings years of experience and expertise working with data center hyperscalers, builders, and standards organizations. He is an active collaborator within the Open Compute Project, presenting at many events on the future of data center connectivity.

1-224-762-0527[email protected]

Related news


Header_Product-News_Han-Contacts-on-Reel.jpg
5 November 2025

Faster processing of turned contacts

HARTING is launching a solution that processes turned contacts on reel to speed up cable assembly in semi-automatic and fully automatic crimping machines. High-quality contacts can thus be crimped onto conductors in a matter of seconds.
read more
Header_Product-News_Han-S-450-Plus.jpg
5 November 2025

Han® S 450 Plus: Reliable and powerful connector for energy storage systems

HARTING's battery connector series now supports up to 500 A for faster charging and discharging—ideal for high-performance energy storage without overheating.
read more
Vertiv SmartIT Banner.png
21 October 2025

Vertiv and HARTING Unveil Data Center Rack Power Solution at OCP Summit

HARTING and Vertiv have teamed up to introduce a new rack power solution designed to simplify and accelerate data center deployment. The Vertiv PDB solution was launched at OCP Summit in San Jose, California
read more

HARTING Newsletter

Social Media


© HARTING Technology Group

  • Imprint
  • Privacy Policy
  • Terms of Use
  • Customer Information